By Mark Jaffe | Colorado Sun
When it came to its water treatment plant Fort Lupton had two concerns: controlling algae in the reservoir next to the plant and the aging diesel generator that backed-up the facility when the electric grid was down.
In collaboration with its power supplier Brighton-based United Power and the co-op’s contractor Schneider Electric the city found a solution for both – and then some.
That plan — a microgrid with a battery fed by 850 kilowatts of solar panels floating on the reservoir — is in line for a $6.1 million grant from the U.S. Department of Energy, part of $366 million awarded to 17 projects in rural areas and tribal nations from Alaska to Florida.
![FD863768-0ACF-495E-9D21-2EF784DFFA6B[1]](https://rockymountainvoice.com/wp-content/uploads/2026/06/FD863768-0ACF-495E-9D21-2EF784DFFA6B1-300x300.png)